Tuyển Cộng tác viên Hoc24 nhiệm kì 26 tại đây: https://forms.gle/dK3zGK3LHFrgvTkJ6

PM

The Barclays London Cycle Hire Scheme started in 2010 is expected to be a feasible (6) _________ to the increasing concern of the existing obstruction issues in the city and the worry about (7) _________ due to inactivity. The money that was necessary to have a scheme like this was sourced from (8) _________ and allowed London to have 5,000 bikes initially, but there are likely to be (9) _________ to the scheme. The bikes have a tracking (10)_________ , are properly equipped and regularly maintained. 

Giúp mik vs


Các câu hỏi tương tự
TP
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết
DM
Xem chi tiết