The Barclays London Cycle Hire Scheme started in 2010 is expected to be a feasible (6) _________ to the increasing concern of the existing obstruction issues in the city and the worry about (7) _________ due to inactivity. The money that was necessary to have a scheme like this was sourced from (8) _________ and allowed London to have 5,000 bikes initially, but there are likely to be (9) _________ to the scheme. The bikes have a tracking (10)_________ , are properly equipped and regularly maintained.
Giúp mik vs